| Originally a British Telecom switching centre the redevelopment of 5,400m2 commercial office space.  The structure was retained, modified and added to, to create a 7 storey commercial spare.   Environmental System The buildings existing heavy mass structure is used in order to reduce winter cooling and summer heating emissions.  In addition the buildings glazing and systems are fully shaded using automatic louved and canopied blinds, this further reducing summer cooling CO2 emissions.  |